Irwin

Group

Irwin

David

+852 5128 3422 | cs@irlservice.com

Renewal of DN400 PE Coated Seawater Pipe in Two Days

2017-05-22

Customer Success Story: A customer required us to measure up the pipe in Hong Kong and then deliver and fit a new PE coated DN400 reducer T-pipe 2 days later in Nansha, China. Job completed on‑time and per quotation.

Frequently, when a pipe requires urgent renewal, the only possible solution is to replace it with an uncoated pipe. This means the pipe will need to be replaced again within a year. With our in‑house coating and fabrication capability, Irwin Marine is able to do the job right, the first time, even with short lead times. The result is savings for our customers.