Irwin Group marine PE-lined piping project

Irwin

Group

Irwin

David

+852 5128 3422 | cs@irlservice.com

Zhoushan Dock — DN800 Large-Bore Pipe Project

Client /A ship-repair yard in Zhoushan

Location /Zhoushan (survey & installation), Shenzhen (manufacture)

Date /2025

A Zhoushan ship-repair yard · DN800 large-bore seawater-pipe replacement

Zhoushan, China | complex DN800 large-bore pipe | no old-pipe removal · digital twin · first-time installation
DN800 seawater main pipework on site at the Zhoushan yard
On site at a Zhoushan ship-repair yard: DN800 large-bore seawater pipe with flanges, elbows and reducing branches — the traditional method would require removing and copying the old pipe

Project Background

A large vessel under repair at a Zhoushan ship-repair yard needed three seawater main lines replaced — DN800 bore, about 25 m total, with 10 flanges, 6 elbows and 3 DN600 reducing branches. By the yard's traditional method, pipe this large and complex would have to be removed whole and copied section by section in an onshore workshop as a template — slow, labour-intensive, and the removal itself risks some damage to the hull structure.

Challenges & Requirements

The core difficulty: the old pipe could not be removed to serve as a copying template. On one hand, Chinese customs tightly controls landing used pipe from foreign vessels; on the other, neither owner nor yard wanted the extra time and hull-damage risk of removal. The yard had never before made pipe this large and geometrically complex from a purely digital survey, and doubted whether the dimensions could be right first time.

Core need: zero old-pipe removal, zero on-site trimming, 100% digitally prefabricated installation

The Irwin Solution

While the vessel was berthed in Zhoushan, the Irwin team boarded and scanned the three in-service DN800 lines directly with Automet, building an as-built digital twin. The workshop laid out and cut the spools to the digital model, using the Automet FAB system to verify dimensions at the tack-weld stage — keeping overall dimensions, including gasket and coating allowances, within PFI-ES3 tolerance of the digital twin. After welding, Automet verification was repeated to confirm no weld distortion before PE lining and external coating.

Process

3D scan of in-service pipeDirect Automet scan, with no old-pipe removal
As-built digital twinGenerating isometrics and manufacturing drawings
✂️ Workshop cutting & tack-weldingCNC cutting and assembly to the digital model
✅ First Automet verificationDimensional re-check at tack-weld stage (including gasket and coating allowances)
Final weldingTIG + FCAW procedure, controlling weld distortion
Post-weld Automet verificationConfirming no distortion and meeting PFI-ES3 tolerance
Rotary PE liningApplying a fully sealed corrosion barrier
External coatingBlast-cleaning + industrial epoxy
Final QCPressure test & dimensional re-check
Installation at the yardLifted and connected directly, with no on-site trimming

Results

100%
First-time installation

All three large-bore spools fitted first time, with no on-site trimming or rework

Zero hot work
Workshop prefabricated

The yard's first pipe replacement with zero on-site hot work — all fabrication done in the workshop

No old-pipe removal
Risk avoided

Completely avoided hull-structure damage and customs-compliance risk

−67%
Installation time cut

Installation time cut to a third of the traditional method, greatly reducing dock occupancy

100% first-time installation — all three large-bore spools fitted first time, with no on-site trimming or rework.
Zero on-site hot work — the yard's first pipe replacement needing no on-site welding or cutting.
No old-pipe removal — avoiding hull damage and customs-compliance risk.
Installation time cut 67% — greatly reducing dock-occupancy cost.

Client Value

For the Zhoushan ship-repair yard, the project meant more than a successful pipe replacement — it was a shift in working philosophy. The yard experienced for the first time the efficiency and quality assurance of the "digital twin + centralised prefabrication" model, overturning the old belief that complex large-bore pipe must be copied from the removed original. The yard has since actively recommended Irwin's prefabricated approach on several later repair projects.

"The yard now actively recommends Irwin's prefabricated approach on later repair projects — digital-twin technology has set a new benchmark for ship repair."