From Precision Survey to Global Delivery

100% workshop-prefabricated — no on-site hot work required

Our Services

From new-spool prefabrication to emergency repair, from refurbishment to global delivery — we solve every seawater-piping problem you face.

New Pipe Prefabrication 100% prefabricated · zero hot work
Working from project drawings or on-site survey data, we prefabricate the entire process in the workshop — cutting, welding, PE lining and anti-corrosion coating. Finished flanged spools are simply bolted up on board, with no hot work or flame-cutting.
Details
  • Prefabricated from Automet® digital-twin models, with allowances reserved for gaskets and coating — dimensional deviation controlled to near-zero.
  • Carbon-steel, stainless and alloy spools to DIN and JIS marine standards (elbows, tees, reducers, basket strainers and other shaped fittings).
  • Every piece ships after PE lining, external coating and hydrostatic testing, with classification-society inspection certificates included.
Where It Fits
  • Newbuild and FSRU seawater-cooling, ballast and scrubber system pipework.
  • BWTS and EGCS retrofit pipework where on-site hot work is restricted.
  • Projects where the owner wants to avoid on-site welding, coating and NDT.
Value

100% first-time fiton installation — no on-site rework, with installation man-hours cut by 60%+

China-factory pricing, delivered worldwide — without the local-yard premium

No on-site hot work at any stage, and no dependence on drydock scheduling.

⚙️ Process & next step
Discuss requirementsDrawings / on-site surveyWorkshop prefabricatedShippingInstallation guidance
Get a fast quote for new-spool prefabrication →
Pipe Refurbishment ~50% cost saving · 5-year warranty
We keep the original parent steel pipe, strip the failed old lining and re-line it with rotary PE. The refurbished pipe matches new-pipe performance at well under half the all-in cost of replacement.
Details
  • Once the old pipe is removed: sandblast to bare metal → internal rotary PE lining (2–10 mm) → external recoating → flange repair → pressure test.
  • On completion you get a full 5-year drydock-to-drydock warranty and a design service life of over 15 years. We handle batch refurbishment (tens to hundreds of spools) — the larger the batch, the lower the unit cost.
  • Batch processing (tens to hundreds of spools) brings unit cost down further with volume.
Where It Fits
  • Seawater lines with lining loss, rubber-lining delamination or external corrosion, where the parent steel wall thickness still meets spec.
  • Owners tightening drydock budgets, compressing dock time, and cutting carbon by reusing the existing pipe and reducing steel waste.
Value

Main-material cost runs at roughly50%-60%of new-pipe cost (down to ~40% on large batches)

Turnaround compressed from 2–3 weeks to 3–5 days, cutting vessel off-hire losses substantially

Over a 10-year life cycle, total spend versus full replacement is reduced by50% or more.

⚙️ Process & next step
Free assessmentPipe removalRefurbishmentTestingInstallation
Free assessment — can my old pipe be refurbished? →
PE Lining (Contract) Rotary lining · seamless, one-piece
Using the rotomoulding (rotary-lining) process, we form a 2–10 mm seamless PE anti-corrosion lining inside carbon-steel fittings and pressure vessels — one continuous layer with no seams and strong resistance to peeling.
Details
  • Suits the full DN50–DN1600 range (straight pipe, elbows, tees, reducers, strainers).
  • Thickness adjustable 2–10 mm — 10–100× a conventional coating — with strong impact resistance.
  • HDPE or LDPE modified compounds available, resisting seawater, acid and alkali, with lining water absorption below 0.01%.
Where It Fits
  • Existing carbon-steel lines or tanks needing internal corrosion protection, or a cost-controlled alternative to stainless steel.
  • Shipyards and design institutes specifying a “carbon steel + PE lining” package, outsourcing the lining work.
  • Re-lining of old pipe and contract PE lining of newbuild spools.
Value

Service life is3-5× that of rubber lining, eliminating water-absorption and delamination failures

At DN250 and above, cost is 13–20% below GRE/GRP, with no ageing or embrittlement risk.

The whole process holdsABS-PDAproduct certification, compliant with international classification-society rules.

⚙️ Process & next step
Provide list / drawingsConfirm parametersWorkshop liningInspection & certificationDispatch
Enquire about contract PE lining →
3D Survey & Reverse Engineering Automet® digital twin
On-site 3D laser scanning measures the pipework in place, flanges and all, and builds a digital-twin model — no removing pipe, no shipping it back to the workshop — outputting production-ready fabrication drawings directly.
Details
  • Outputs isometric drawings with fabrication tolerances, reserving flange gaps, gasket and coating allowances.
  • The data drives workshop prefabrication and builds a digital archive of ageing pipework, so the model can be reused for spares and repairs.
Where It Fits
  • Ageing vessels with no original drawings and no dimensional basis for pipe renewal.
  • Complex, irregular pipe runs where manual measurement is error-prone.
  • Cross-border projects where customs rules prevent shipping the old pipe back — production runs remotely from the digital model.
Value

Avoids the distortion errors of copying an old pipe — first-time installation acceptance of prefabricated spools reaches100%

Reduces on-site tack-weld rework and saves2~5days of drydock time.

⚙️ Process & next step
Book on-site surveyOn-board scanningModel / drawing output(Optional) move to prefabrication
Book an on-site 3D survey →
Global Delivery & Installation Local survey · Made in China · Global delivery
Automet on-site survey + workshop prefabrication in China + cross-border logistics + local installation, delivered end-to-end — produced and delivered remotely without shipping the old pipe back.
Details
  • We dispatch certified surveyors aboard to capture the digital twin (covering the US, UK, Philippines, Türkiye and more).
  • Our Shenzhen factory builds precisely to the digital model, 100% prefabricated, with English-language certificates.
  • Shipped by sea or air to the destination port, with an installation team available or coordination with the local yard.
Where It Fits
  • Vessels operating where no class-approved PE-lining facility exists locally, and owners are concerned about remote after-sales cover.
  • Cross-border projects constrained by import/export rules, where the old pipe cannot be sampled across borders — production runs remotely from the digital twin.
Value

We deliver China-factory pricing worldwide

Removes old-pipe customs clearance and sea-freight loss risk.

5-year global warranty — after-sales support available wherever the vessel calls.

⚙️ Process & next step
Provide vessel position / needsAssess & dispatchWorkshop prefabricationInternational shippingInstallation support
✈️ Enquire about a global-delivery project →
On-Site / Emergency Repair 24h response · no drydock needed
For sudden pipe leaks at anchor or in port, we attend with prefabricated PE-lined spool sections, completing the repair in as little as 24 hours — no hot work, no drydocking.
Details
  • On-site ultrasonic wall-thickness testing plus borescope inspection define the damaged section.
  • The faulty section is cut out and replaced with a bolted, flanged prefabricated PE-lined spool — entirely weld-free.
  • Hydrostatic test on completion, with a formal repair report issued.
Where It Fits
  • Sudden perforation, flange leakage or wall cracking that cannot wait for a planned drydock.
  • Vessels waiting to load or facing tight dock berths, where demurrage costs are high.
Value

24h emergency line— most faults resolved the same day

Repair cost is under50%

On completion you receive a5-year warrantywarranty (same standard as pipe refurbishment).

⚙️ Process & next step
Call the 24h lineRemote assessmentSpools brought to siteRepair & sign-off
Save our emergency line: +852 5128 3422

Manufacturing Process

Our process covers the full pipe life cycle across 9 precise steps, grouped into three stages: on-site digital survey, precision workshop prefabrication and lining, and finished-product inspection with global delivery.

Global Survey

Automet® digital-twin technology measures pipework precisely in service — no need to copy the old pipe.

Precision Fabrication & Lining

CNC cutting + rotary weldingPE rotomoulded lining, for complex fittings above DN50

Quality Control & Delivery

End-to-end quality inspectionGlobal logistics — ready to install on arrival

✦ PE Rotomoulded Lining Process ✦
Survey
Cutting & sampling
Machining & welding
Sandblasting
PE rotomoulded lining
Painting
Final inspection
Finished spool

Stage 1 — Precision Survey & Data Capture

Traditional pipe renewal means removing the old pipe and copying it in the workshop — slow and prone to error. Our digital-twin approach changes that.

Step 1

Survey / mapping (Automet® 3D digital measurement)

Using a Leica total station with the Automet® system, we capture a high-precision 3D scan with the pipe still in service and bolted in place, generating an accurate digital-twin model without removing the old pipe.

  • Each spool takes only 2–3 minutes to survey.
  • Simultaneous 3D check of squareness, alignment and dimensions.
  • Instant 3D digital deviation report.
  • Reverse-engineered drawings for older vessels with no plans.

Representative project: survey in Brazil → fabrication in China → installation in Türkiye | Zhoushan DN800 project — digital survey straight to prefabrication

Stage 2 — Precision Fabrication & Corrosion-Protection Core

From steel to corrosion-protected pipe, every step is engineered for the harsh marine environment.

Step 2

Cutting / material intake

Material requirements are calculated precisely from the digital-twin data. Raw material is rigorously verified before stock-in to ensure quality at source.

  • Full material certificates for carbon steel, stainless and alloy.
  • Spectrometer material re-verification.
  • CNC cutting ensures pipe-end accuracy.

 

Step 3

Fabrication / welding

CNC cutting plus precision welding by certified welders in an enclosed workshop, with welds compliant to ABS / DNV / BV classification-society procedures.

  • CNC cutting eliminates manual bevel defects.
  • Rotary-axis welding improves consistency.
  • TIG root pass + FCAW fill and cap.
  • Workshop prefabrication replaces on-site hot work — safer.

Step 4

Sandblasting

Blast-cleaned to Sa 2.5 with a controlled roughness profile to ensure PE lining and external coating adhesion.

  • Surface cleanliness: Sa 2.5 (ISO 8501-1).
  • Roughness: Rz 50–75 μm.

Step 5

PE lining / rotomoulding (core process)

Usingrotary liningtechnology, evenly applying high-performance polyethylene powder to the pipe's inner wall, fused at high temperature into a dense, seamless corrosion barrier — like giving the steel pipe a permanent inner skin.

  • LDPE / HDPE / Super Seal LDPE options.
  • Uniform coating thickness, tolerance < 0.5 mm.
  • Seamless, with no weak points.
  • Suits complex geometries above DN50.
  • Passes 1,000-hour salt-spray testing.

Service life: PE-lined seawater pipe over 15 years, with a 5-year warranty

Stage 3 — Quality Control & Global Delivery

Before it ships, we are more demanding than the customer — every pipe must pass final inspection.

Step 6

Painting / surface finishing

After PE lining, the pipe exterior is coated. We offer a range of anti-corrosion coating systems to suit the customer — protected inside and out.

  • Epoxy zinc-rich primer + polyurethane topcoat (standard marine spec).
  • Customisable to the customer's specified coating system.

Step 7

Pipe inspection / final QC

Every pipe must pass a full inspection routine:

  • Automet® second scan to verify dimensional tolerances.
  • PE peel-strength test and borescope inspection.
  • Hydrostatic / pneumatic pressure testing.
  • Coating-thickness and visual inspection.
  • Stamped with a traceable “inspection passed” mark

 

Step 8

Finished spool

Every pipe that passes all checks carries a unique traceability code, linking the full record from raw material to dispatch.

  • 100% dimensional fit — no on-site modification.
  • Dual protection: internal PE lining + external coating.
  • Complete quality file included: material certificates, welding records, inspection reports.

Step 9

Handling / shipping & loading

Finished spools are professionally packed and braced, shipped to any port worldwide, with full logistics tracking to ensure zero transit damage.

  • Standard urgent orders: 6–8 day fast delivery.
  • Global delivery network across Asia, Europe, the Middle East and South America.
  • Timber-cradle bracing + moisture wrap + lifting-point marking.

Global delivery example: survey in Brazil → fabrication in China → installation in Türkiye | international delivery of the Sweden pipe project

 

Warranty Policy

5-year drydock-to-drydock warranty

Every PE-lined new or refurbished pipe shipped by Irwin carries a 5-year warranty from the date installation is completed.

✔ Refurbished pipe carries the same full 5-year warranty
Warranty coverage
ItemDetailsCovered
PE liningPeeling, delamination, blistering and excessive wear not caused by external force✅ Covered
Flange sealing faceUnevenness or leakage caused by lining or manufacturing defects✅ Covered
External coating (standard epoxy)Peeling or blistering not caused by external force or chemical attack (per ISO)✅ Covered
Welded jointsWeld-quality defects confirmed by NDT (cracks, lack of fusion, etc.)✅ Covered
Third-party or external-force damageDamage after installation from impact, cutting, over-temperature operation, etc.❌ Not covered
Over-temperature / chemical attackSustained conveying above PE's temperature limit (>80°C) or organic solvents❌ Not covered
⏱ Warranty term & start date

Start:Calculated from the date the pipe is installed on site and passes its pressure test.
Term:5 years (covering the full drydock cycle).
Refurbished pipe:Identical to new pipe — the same 5-year drydock-to-drydock warranty.
Design life:Beyond the 5-year warranty the PE lining keeps performing, with an expected life over 15 years (case-supported, not an additional guarantee).

After-sales process — what if something fails?
1

Report the issue

For a pipe leak, lining issue or similar, call our 24h line +852 5128 3422 or email warranty@irlservice.com.

2

Fast response

Acknowledged within 2 hours, with a technician arranged for video or on-site inspection within 24 hours.

3

Liability assessment

In warranty → free repair / replacement; out of warranty → a paid repair proposal.

4

Carry out repair

Prefabricated PE spools and flange replacement, typically completed in 3–5 days.

5

Sign-off

The customer signs off; Irwin retains the repair record so later service is traceable.

⚠️ Warranty limitations
  • The customer must retain the original purchase contract or order number.
  • The pipe must be used per Irwin's operating guidance (no over-temperature, no organic solvents, etc.).
  • No welding, cutting or modification of the pipe without Irwin's authorisation.
  • Normal wear and flow reduction from marine growth are not covered.
  • Damage from accident, fire or improper operation is excluded.
How to claim

We use the information you provide for quotations and project follow-up. It may be processed by our service providers and related operating entities, and retained only as needed for those purposes and applicable legal or business records. Read the Personal Information Collection Statement. Access or correction: cs@irlservice.com.

Ready to upgrade your seawater-piping solution?

Book a consultation

Book a 15-minute Teams call with David Schaus to discuss your project.

Download resources

Get“Marine Seawater Pipe: Refurbish vs Replace — Life-Cycle Cost Comparison”, with the full comparison data

Free Assessment

No removing old pipe, no shipping scrap steel — tell us your pipe's condition and we'll assess and quote, free of charge.