From Precision Survey to Global Delivery

100% workshop-prefabricated — no on-site hot work required

Our Services

From new-spool prefabrication to emergency repair, from refurbishment to global delivery — we solve every seawater-piping problem you face.

New Pipe Prefabrication 100% prefabricated · zero hot work
Working from project drawings or on-site survey data, we prefabricate the entire process in the workshop — cutting, welding, PE lining and anti-corrosion coating. Finished flanged spools are simply bolted up on board, with no hot work or flame-cutting.
Details
  • Prefabricated from Automet® digital-twin models, with allowances reserved for gaskets and coating — dimensional deviation controlled to near-zero.
  • Carbon-steel, stainless and alloy spools to DIN and JIS marine standards (elbows, tees, reducers, basket strainers and other shaped fittings).
  • Every piece ships after PE lining, external coating and hydrostatic testing, with classification-society inspection certificates included.
Where It Fits
  • Newbuild and FSRU seawater-cooling, ballast and scrubber system pipework.
  • BWTS and EGCS retrofit pipework where on-site hot work is restricted.
  • Projects where the owner wants to avoid on-site welding, coating and NDT.
Value

100% first-time fiton installation — no on-site rework, with installation man-hours cut by 60%+

China-factory pricing, delivered worldwide — without the local-yard premium

No on-site hot work at any stage, and no dependence on drydock scheduling.

⚙️ Process & next step
Discuss requirementsDrawings / on-site surveyWorkshop prefabricatedShippingInstallation guidance
Get a fast quote for new-spool prefabrication →
Pipe Refurbishment ~50% cost saving · 5-year warranty
We keep the original parent steel pipe, strip the failed old lining and re-line it with rotary PE. The refurbished pipe matches new-pipe performance at well under half the all-in cost of replacement.
Details
  • Once the old pipe is removed: sandblast to bare metal → internal rotary PE lining (2–10 mm) → external recoating → flange repair → pressure test.
  • On completion you get a full 5-year drydock-to-drydock warranty and a design service life of over 15 years. We handle batch refurbishment (tens to hundreds of spools) — the larger the batch, the lower the unit cost.
  • Batch processing (tens to hundreds of spools) brings unit cost down further with volume.
Where It Fits
  • Seawater lines with lining loss, rubber-lining delamination or external corrosion, where the parent steel wall thickness still meets spec.
  • Owners tightening drydock budgets, compressing dock time, and cutting carbon by reusing the existing pipe and reducing steel waste.
Value

Main-material cost runs at roughly50%-60%of new-pipe cost (down to ~40% on large batches)

Turnaround compressed from 2–3 weeks to 3–5 days, cutting vessel off-hire losses substantially

Over a 10-year life cycle, total spend versus full replacement is reduced by50% or more.

⚙️ Process & next step
Free assessmentPipe removalRefurbishmentTestingInstallation
Free assessment — can my old pipe be refurbished? →
PE Lining (Contract) Rotary lining · seamless, one-piece
Using the rotomoulding (rotary-lining) process, we form a 2–10 mm seamless PE anti-corrosion lining inside carbon-steel fittings and pressure vessels — one continuous layer with no seams and strong resistance to peeling.
Details
  • Suits the full DN50–DN1600 range (straight pipe, elbows, tees, reducers, strainers).
  • Thickness adjustable 2–10 mm — 10–100× a conventional coating — with strong impact resistance.
  • HDPE or LDPE modified compounds available, resisting seawater, acid and alkali, with lining water absorption below 0.01%.
Where It Fits
  • Existing carbon-steel lines or tanks needing internal corrosion protection, or a cost-controlled alternative to stainless steel.
  • Shipyards and design institutes specifying a “carbon steel + PE lining” package, outsourcing the lining work.
  • Re-lining of old pipe and contract PE lining of newbuild spools.
Value

Service life is3-5× that of rubber lining, eliminating water-absorption and delamination failures

At DN250 and above, cost is 13–20% below GRE/GRP, with no ageing or embrittlement risk.

The whole process holdsABS-PDAproduct certification, compliant with international classification-society rules.

⚙️ Process & next step
Provide list / drawingsConfirm parametersWorkshop liningInspection & certificationDispatch
Enquire about contract PE lining →
3D Survey & Reverse Engineering Automet® digital twin
On-site 3D laser scanning measures the pipework in place, flanges and all, and builds a digital-twin model — no removing pipe, no shipping it back to the workshop — outputting production-ready fabrication drawings directly.
Details
  • Outputs isometric drawings with fabrication tolerances, reserving flange gaps, gasket and coating allowances.
  • The data drives workshop prefabrication and builds a digital archive of ageing pipework, so the model can be reused for spares and repairs.
Where It Fits
  • Ageing vessels with no original drawings and no dimensional basis for pipe renewal.
  • Complex, irregular pipe runs where manual measurement is error-prone.
  • Cross-border projects where customs rules prevent shipping the old pipe back — production runs remotely from the digital model.
Value

Avoids the distortion errors of copying an old pipe — first-time installation acceptance of prefabricated spools reaches100%

Reduces on-site tack-weld rework and saves2~5days of drydock time.

⚙️ Process & next step
Book on-site surveyOn-board scanningModel / drawing output(Optional) move to prefabrication
Book an on-site 3D survey →
Global Delivery & Installation Local survey · Made in China · Global delivery
Automet on-site survey + workshop prefabrication in China + cross-border logistics + local installation, delivered end-to-end — produced and delivered remotely without shipping the old pipe back.
Details
  • We dispatch certified surveyors aboard to capture the digital twin (covering the US, UK, Philippines, Türkiye and more).
  • Our Shenzhen factory builds precisely to the digital model, 100% prefabricated, with English-language certificates.
  • Shipped by sea or air to the destination port, with an installation team available or coordination with the local yard.
Where It Fits
  • Vessels operating where no class-approved PE-lining facility exists locally, and owners are concerned about remote after-sales cover.
  • Cross-border projects constrained by import/export rules, where the old pipe cannot be sampled across borders — production runs remotely from the digital twin.
Value

We deliver China-factory pricing worldwide

Removes old-pipe customs clearance and sea-freight loss risk.

5-year global warranty — after-sales support available wherever the vessel calls.

⚙️ Process & next step
Provide vessel position / needsAssess & dispatchWorkshop prefabricationInternational shippingInstallation support
✈️ Enquire about a global-delivery project →
On-Site / Emergency Repair 24h response · no drydock needed
For sudden pipe leaks at anchor or in port, we attend with prefabricated PE-lined spool sections, completing the repair in as little as 24 hours — no hot work, no drydocking.
Details
  • On-site ultrasonic wall-thickness testing plus borescope inspection define the damaged section.
  • The faulty section is cut out and replaced with a bolted, flanged prefabricated PE-lined spool — entirely weld-free.
  • Hydrostatic test on completion, with a formal repair report issued.
Where It Fits
  • Sudden perforation, flange leakage or wall cracking that cannot wait for a planned drydock.
  • Vessels waiting to load or facing tight dock berths, where demurrage costs are high.
Value

24h emergency line— most faults resolved the same day

Repair cost is under50%

On completion you receive a5-year warrantywarranty (same standard as pipe refurbishment).

⚙️ Process & next step
Call the 24h lineRemote assessmentSpools brought to siteRepair & sign-off
Save our emergency line: +852 5128 3422

Manufacturing Process

Our process covers the full pipe life cycle across 9 precise steps, grouped into three stages: on-site digital survey, precision workshop prefabrication and lining, and finished-product inspection with global delivery.

Global Survey

Automet® digital-twin technology measures pipework precisely in service — no need to copy the old pipe.

Precision Fabrication & Lining

CNC cutting + rotary weldingPE rotomoulded lining, for complex fittings above DN50

Quality Control & Delivery

End-to-end quality inspectionGlobal logistics — ready to install on arrival

✦ PE Rotomoulded Lining Process ✦
Survey
Cutting & sampling
Machining & welding
Sandblasting
PE rotomoulded lining
Painting
Final inspection
Finished spool

Stage 1 — Precision Survey & Data Capture

Traditional pipe renewal means removing the old pipe and copying it in the workshop — slow and prone to error. Our digital-twin approach changes that.

Step 1

Survey / mapping (Automet® 3D digital measurement)

Using a Leica total station with the Automet® system, we capture a high-precision 3D scan with the pipe still in service and bolted in place, generating an accurate digital-twin model without removing the old pipe.

  • Each spool takes only 2–3 minutes to survey.
  • Simultaneous 3D check of squareness, alignment and dimensions.
  • Instant 3D digital deviation report.
  • Reverse-engineered drawings for older vessels with no plans.

Representative project: survey in Brazil → fabrication in China → installation in Türkiye | Zhoushan DN800 project — digital survey straight to prefabrication

Stage 2 — Precision Fabrication & Corrosion-Protection Core

From steel to corrosion-protected pipe, every step is engineered for the harsh marine environment.

Step 2

Cutting / material intake

Material requirements are calculated precisely from the digital-twin data. Raw material is rigorously verified before stock-in to ensure quality at source.

  • Full material certificates for carbon steel, stainless and alloy.
  • Spectrometer material re-verification.
  • CNC cutting ensures pipe-end accuracy.

 

Step 3

Fabrication / welding

CNC cutting plus precision welding by certified welders in an enclosed workshop, with welds compliant to ABS / DNV / BV classification-society procedures.

  • CNC cutting eliminates manual bevel defects.
  • Rotary-axis welding improves consistency.
  • TIG root pass + FCAW fill and cap.
  • Workshop prefabrication replaces on-site hot work — safer.

Step 4

Sandblasting

Blast-cleaned to Sa 2.5 with a controlled roughness profile to ensure PE lining and external coating adhesion.

  • Surface cleanliness: Sa 2.5 (ISO 8501-1).
  • Roughness: Rz 50–75 μm.

Step 5

PE lining / rotomoulding (core process)

Usingrotary liningtechnology, evenly applying high-performance polyethylene powder to the pipe's inner wall, fused at high temperature into a dense, seamless corrosion barrier — like giving the steel pipe a permanent inner skin.

  • LDPE / HDPE / Super Seal LDPE options.
  • Uniform coating thickness, tolerance < 0.5 mm.
  • Seamless, with no weak points.
  • Suits complex geometries above DN50.
  • Passes 1,000-hour salt-spray testing.

Service life: PE-lined seawater pipe over 15 years, with a 5-year warranty

Stage 3 — Quality Control & Global Delivery

Before it ships, we are more demanding than the customer — every pipe must pass final inspection.

Step 6

Painting / surface finishing

After PE lining, the pipe exterior is coated. We offer a range of anti-corrosion coating systems to suit the customer — protected inside and out.

  • Epoxy zinc-rich primer + polyurethane topcoat (standard marine spec).
  • Customisable to the customer's specified coating system.

Step 7

Pipe inspection / final QC

Every pipe must pass a full inspection routine:

  • Automet® second scan to verify dimensional tolerances.
  • PE peel-strength test and borescope inspection.
  • Hydrostatic / pneumatic pressure testing.
  • Coating-thickness and visual inspection.
  • Stamped with a traceable “inspection passed” mark

 

Step 8

Finished spool

Every pipe that passes all checks carries a unique traceability code, linking the full record from raw material to dispatch.

  • 100% dimensional fit — no on-site modification.
  • Dual protection: internal PE lining + external coating.
  • Complete quality file included: material certificates, welding records, inspection reports.

Step 9

Handling / shipping & loading

Finished spools are professionally packed and braced, shipped to any port worldwide, with full logistics tracking to ensure zero transit damage.

  • Standard urgent orders: 6–8 day fast delivery.
  • Global delivery network across Asia, Europe, the Middle East and South America.
  • Timber-cradle bracing + moisture wrap + lifting-point marking.

Global delivery example: survey in Brazil → fabrication in China → installation in Türkiye | international delivery of the Sweden pipe project

 

Warranty Policy

5-year drydock-to-drydock warranty

Every PE-lined new or refurbished pipe shipped by Irwin carries a 5-year warranty from the date installation is completed.

✔ Refurbished pipe carries the same full 5-year warranty
Warranty coverage
ItemDetailsCovered
PE liningPeeling, delamination, blistering and excessive wear not caused by external force✅ Covered
Flange sealing faceUnevenness or leakage caused by lining or manufacturing defects✅ Covered
External coating (standard epoxy)Peeling or blistering not caused by external force or chemical attack (per ISO)✅ Covered
Welded jointsWeld-quality defects confirmed by NDT (cracks, lack of fusion, etc.)✅ Covered
Third-party or external-force damageDamage after installation from impact, cutting, over-temperature operation, etc.❌ Not covered
Over-temperature / chemical attackSustained conveying above PE's temperature limit (>80°C) or organic solvents❌ Not covered
⏱ Warranty term & start date

Start:Calculated from the date the pipe is installed on site and passes its pressure test.
Term:5 years (covering the full drydock cycle).
Refurbished pipe:Identical to new pipe — the same 5-year drydock-to-drydock warranty.
Design life:Beyond the 5-year warranty the PE lining keeps performing, with an expected life over 15 years (case-supported, not an additional guarantee).

After-sales process — what if something fails?
1

Report the issue

For a pipe leak, lining issue or similar, call our 24h line +852 5128 3422 or email warranty@irlservice.com.

2

Fast response

Acknowledged within 2 hours, with a technician arranged for video or on-site inspection within 24 hours.

3

Liability assessment

In warranty → free repair / replacement; out of warranty → a paid repair proposal.

4

Carry out repair

Prefabricated PE spools and flange replacement, typically completed in 3–5 days.

5

Sign-off

The customer signs off; Irwin retains the repair record so later service is traceable.

⚠️ Warranty limitations
  • The customer must retain the original purchase contract or order number.
  • The pipe must be used per Irwin's operating guidance (no over-temperature, no organic solvents, etc.).
  • No welding, cutting or modification of the pipe without Irwin's authorisation.
  • Normal wear and flow reduction from marine growth are not covered.
  • Damage from accident, fire or improper operation is excluded.
How to claim

Ready to upgrade your seawater-piping solution?

Book a consultation

Book a 15-minute Teams call with David Schaus to discuss your project.

Download resources

Get“Marine Seawater Pipe: Refurbish vs Replace — Life-Cycle Cost Comparison”, with the full comparison data

Free Assessment

No removing old pipe, no shipping scrap steel — tell us your pipe's condition and we'll assess and quote, free of charge.