by webmaster | May 22, 2017 | Lining
A customer required us to measure up the pipe in Hong Kong and then deliver and fit a new PE coated DN400 reducer T-pipe 2 days later in Nansha, China. Job completed on-time and per quotation. Frequently, when a pipe requires urgent renewal, the only possible solution...
by webmaster | Apr 25, 2017 | Lining
伊荣德滚塑管业(深圳)有限公司完成了蛇口友联船厂的第一个聚乙烯衬里管大额订单,在短短72小时内提供完成了超过100根海水管的聚乙烯防腐衬里。管道衬里工艺和翻新的技术工艺演示如下: 管道衬里工艺和翻新的技术工艺 from David Schaus 技术总监薛大卫指出:“管道防腐衬里或翻新的交付速度一直是主要的问题。伊荣德滚塑管业有限公司是首个能够在短暂的船舶坞修期内,顺利完成管道的聚乙烯防腐衬里和翻新的企业”...
by webmaster | Apr 25, 2017 | Lining
Irwin Marine Services completed their first major order of PE lined pipes for a client at Yiu Lian Dockyards Shekou; initial order being for over 100 PE lined seawater pipes on tight 72 hour deadlines. A technical presentation of the pipe refurbishment and coating...
by webmaster | Mar 17, 2017 | Coating, ship repair
The pipe on the right was the original rubber coated pipe from a ship built in 1998, in Europe. It is coated in a seamless rubber coating and lasted a respectable 14 years. The pipe in the middle was fabricated in 2012 by a Chinese dockyard and coated with a...
by webmaster | Mar 7, 2017 | Lining, ship repair
[vc_row][vc_column][vc_column_text]Irwin Marine Services — Keeping our customers out of the dockyard is always our primary objective and an improperly repaired overboard pipe (ship repair) has the potential to land a vessel in the dockyard. The advantages of working...